Day 2-  Drill and pin spa wall.  Form up and pour concrete.  This project will have 2 layers.  Lower layer is the base for a rock cascade.  Upper layer will hold spillway rock and spa side tile.

At tear out, this corner came off.  Pin/form up and rebuild.

Day 2

Spa wall steel and forming

3

4

5

6

Pool Remodel

Pool Renovation

Pool Remodel in North Texas

North Texas Pool Remodel

North Texas Pool Renovation

North Texas Pool Renovations

Pool Renovation in North Texas

Swimming Pool Remodeling

Swimming Pool Remodeling in North Texas

Retile

Tile

Recoping

Retile

Plaster

Replaster

Pool Refinishing

Before-After pool renovations

Redecking

Concrete

Pool Refurbishing

Pool Renewal

Swimming Pool Renovations

North Texas Swimming Pool Renovations

Dallas Pool Renovations

Ft. Worth Pool Renovations

Metroplex Pool Renovations

7

8

9

10

11