Before-After  White plaster to Bay Harbor Crystal Stone (mini).  Rock capped entry steps and benches.  Tile is Noble Rain Forest 37.  Oklahoma cut coping (not random).

Day 9:  Acid wash pebble finish/start water.  When full, chemical start up by our chemical tech.

 

Day 10:  Power wash old patio, old pool deck, new concrete pour.  Mask off coping and mix/squeegee base coat material onto deck/patio.  Let dry. 

 

Day 11:  A tape pattern/texture on the upper patio only will be installed.  It will look somewhat like the pattern on the raised spa.  Texture on the lower deck. 

Prior to spraying texture on the patio, paper masking will be used to cover the brick, landscaping.  Deck-o-seal and final color coat (aggregate effect) will just about finish this project up.