Rounded Rectangular Callout: Acid wash old pool surface
Rounded Rectangular Callout: Mix up bond coat
Rounded Rectangular Callout: Apply a 
Bond coat

The following is the basics of a prep procedure in a replaster.  After the materials dry (the next day), the project will be ready for a plaster crew.  The objective is a rough surface that the new plaster will cover and stick to it.

 

On this job, steel rust from steel rebar is cut out and sealed.  Rope anchors were removed and will be filled in.  A tile repair was done.